MUGA Sports Court — Nottinghamshire

Multi-use games area (MUGA) marking for a secondary school in Nottinghamshire — football, basketball, netball, and tennis court layouts marked on a new macadam surface, ready for the summer term.

Free, no-obligation quotes
Project Overview

About This Project

A secondary school in Nottinghamshire had a new multi-use games area (MUGA) installed as part of a wider sports facility upgrade. The macadam surface was laid by a separate contractor, and Markex was appointed to carry out the court marking scheme. The school required a full multi-sport layout that would allow the MUGA to be used for football, basketball, netball, and tennis — maximising the facility's value for PE lessons and after-school clubs.

Project Details

Location
Nottinghamshire
Sector
Education
Completed
May 2026
Service Type
Sports Court Marking

Services Provided

  • MUGA sports court marking
  • Football court layout
  • Basketball court layout
  • Netball court layout
  • Tennis court layout
  • Multi-sport court design consultation

Similar project?

Get a free, no-obligation quote from Markex. We respond within one working day.

Get a Free Quote
The Challenge

What the Client Needed

The MUGA surface had been laid to a tight schedule and the school needed the court markings completed before the start of the summer term. The multi-sport layout required careful planning to ensure all four court types could be accommodated on the available surface area without the markings becoming confusing or overlapping in a way that made individual sports difficult to play.

Our Solution

How Markex Delivered

Markex worked with the school's PE department to design a multi-sport layout that maximised the MUGA's usability. Each sport was assigned a distinct line colour to avoid confusion: white for football, yellow for basketball, blue for netball, and green for tennis. All markings were applied using two-part road paint for durability on the macadam surface. The work was completed in a single day, with the MUGA ready for use at the start of the summer term.

The Results

What We Achieved

  • Full multi-sport MUGA layout completed in a single day
  • Four sports accommodated: football, basketball, netball, and tennis
  • Colour-coded lines for each sport to avoid confusion
  • Ready for use at the start of the summer term
  • Two-part road paint for long-term durability on macadam surface

Project details are based on typical Markex work of this type.

Project Photography

Photography is illustrative. Project details are based on typical Markex work of this type.

Before — MUGA Sports Court — Nottinghamshire
BeforeBefore: new macadam MUGA surface freshly laid — no court markings, no sport layouts, not yet usable for PE or after-school clubs
After — MUGA Sports Court — Nottinghamshire
AfterAfter: complete multi-sport MUGA layout — colour-coded lines for football, basketball, netball, and tennis, completed in a single day