Distribution Centre Floor Marking — Doncaster

Complete warehouse floor marking for a 50,000 sq ft distribution centre in Doncaster — forklift lanes, pedestrian walkways, racking bay positions, and loading zones — delivered in a single weekend to meet the client's move-in deadline.

Free, no-obligation quotes
Project Overview

About This Project

A logistics operator taking on a newly leased 50,000 sq ft distribution centre near Doncaster required a complete floor marking scheme before operations could begin. The facility had no existing markings and the client had a fixed move-in date — operations were due to commence on the Monday morning following a weekend handover. Markex was appointed to design and deliver the full floor marking scheme within this tight window.

Project Details

Location
Doncaster
Sector
Logistics & Distribution
Completed
August 2026
Service Type
Warehouse Line Marking

Services Provided

  • Warehouse floor marking
  • Forklift lane marking
  • Pedestrian walkway marking
  • Racking bay position marking
  • Loading zone marking
  • Fire exit route marking
  • Two-part epoxy floor paint application

Similar project?

Get a free, no-obligation quote from Markex. We respond within one working day.

Get a Free Quote
The Challenge

What the Client Needed

The client had a non-negotiable Monday morning start date for operations. The 50,000 sq ft facility required a complete floor marking scheme — including pedestrian and forklift segregation, racking bay positions, loading zones, and fire exit routes — to be designed, applied, and fully cured within a single weekend. The concrete floor also required preparation work before markings could be applied.

Our Solution

How Markex Delivered

Markex mobilised a team of four operatives for a full weekend shift. The floor was cleaned and degreased on Saturday morning, with all markings applied using two-part epoxy floor paint throughout Saturday afternoon and evening. By Sunday evening all markings were fully cured and the facility was ready for racking installation. The client's operations commenced on schedule on Monday morning.

The Results

What We Achieved

  • 50,000 sq ft marked and cured within a single weekend
  • Full HSE-compliant pedestrian and forklift segregation
  • Racking bay positions marked to client's exact layout specification
  • Fire exit routes and emergency assembly points clearly marked
  • Operations commenced on schedule Monday morning
Project Photography
Before — Distribution Centre Floor Marking — Doncaster
BeforeBefore: empty 50,000 sq ft distribution centre floor with no markings — no pedestrian segregation, forklift lanes, or racking positions
After — Distribution Centre Floor Marking — Doncaster
AfterAfter: complete HSE-compliant floor marking scheme — yellow forklift lanes, white pedestrian walkways, racking bay positions, and loading zones